Page 725 - Radiation Safety
P. 725

ENVIRONMENTAL MONITORING




                                     MONITORING STAGES





                                     ❑PRE-OPERATIONAL

                                            • Prior to plant construction, covers bigger area (e.g: 5 km to 20 km

                                                radius)

                                            • To determine background/baseline radiation & radioactivity level in
                                                the environment


                                     ❑OPERATIONAL

                                            • During operation, covers smaller area

                                            • To ensure the effectiveness of the effluent control system & program
                                                and compliance with standards


                                     ❑POST-OPERATIONAL

                                            • After cease of operation

                                            • To verify that the site is free from radioactive contamination
   720   721   722   723   724   725   726   727   728   729   730