Page 725 - Radiation Safety
P. 725
ENVIRONMENTAL MONITORING
MONITORING STAGES
❑PRE-OPERATIONAL
• Prior to plant construction, covers bigger area (e.g: 5 km to 20 km
radius)
• To determine background/baseline radiation & radioactivity level in
the environment
❑OPERATIONAL
• During operation, covers smaller area
• To ensure the effectiveness of the effluent control system & program
and compliance with standards
❑POST-OPERATIONAL
• After cease of operation
• To verify that the site is free from radioactive contamination