Page 25 - Radiation Safety
P. 25

SAFETY & WORKING PROCEDURES IN SALES



                           PROCEDURES FOR INSTALLATION


                           BEFORE                         DURING                                      AFTER                           DECOMISSIONING
                           1.  Get approval from AELB     1.  Put up warning sign                     Commissioning report must be    Decommissioning shall be carried
                           2.  Provide personnel dosimeter   2.  Barricade the area  (No unauthorized enter)  submitted to AELB within 14 days   out using standard procedure
                              to workers                  3.  Measure radiation leakage (not exceed   after commissioning has been    approved by AELB or other
                           3.  Survey meter is calibrated & in   permissible limit)                   completed.                      appropriate authority.
                              good working order.         4.  Examine any leak of RAM from sealed sources.
                                                          5.  Take remedial action if equipment does not
                                                             comply with the requirement
                                            PROCEDURES FOR MAINTENANCE
                           BEFORE                                       DURING                                        AFTTER
                           1.  Get approval from AELB                   1.  Put up warning sign                       1.  Keep all exposures and maintenance records
                           2.  Provide personnel dosimeter to workers   2.  Barricade the area (No unauthorized enter)  2.  Submit maintenance reports to AELB within 30
                           3.  Survey meter is calibrated & in good working   3.  Switch off the irradiating apparatus & the   days after maintenance work has been
                              order.                                        shutter of nuclear gauge is closed.          completed.
                                                                        4.  Measure any radiation leakage
                                                                        5.  Record all radiation exposure received during
                                                                            maintenance.

                                        LEAK TEST                                                  LEAKAGE TEST

                                        -  To check on seepage of RAM from sealed source.          - To measure if  there is any radiation leak  above approved
                                        - Frequency : Annually                                       level for
                                                       rd
                                        - Performed by 3 party & competent person                     irradiating apparatus  & sealed source
                                        - Activity must be <5nCi (185 Bq)                          - Frequency : Annually
                                        Procedure :
                                        1. Install adequate barrier and warning sign
                                        2. Every personnel involved must wear a personnel  dosimeter
                                        3. Use a calibrated survey meter to measure radiation level on
                                           the nuclear gauge.
   20   21   22   23   24   25   26   27   28   29   30