More of Response 41
10 hours later, sources recovered and 0.1 m3 of top soil
removed
A thorough and systematic survey was conducted
Background readings of 8-12 µR/hr (60-100 nSv/h)
Highway washed and re-opened 16 hours after the accident
© Copyright 2021 | Training Slides